• 10 Posts
  • 543 Comments
Joined 2 years ago
cake
Cake day: July 9th, 2023

help-circle






  • I’m halfway competent, spent 10 years in IT and even compiled my own kernel back in the early 2000s.

    My last 3 attempts at running Ubuntu turned into complete and utter failures, including having to totally reinstall the system over the top of itself because the system became so corrupted it wouldn’t even boot.

    And, I barely got steam to work on it. I wasted hundreds of hours and ended up with a barely functional computer that couldn’t print, didn’t support my computers wifi card, and 90% of my work programs aren’t available.

    Oh, and someone please support AMD video cards.







  • It’s worse. Fabric softener is composed of an anti static oil. When you run it in the laundry, it coats all of your clothes with a very thin layer of oil.

    Which is why towels dried with fabric softener and dryer sheets don’t absorb water anywhere near as well as plain towels dried without it!!

    My mom complained to me for years that I wasn’t “doing it right” by not using fabric softener. But her towels are useless compared to mine! She continues to spends $100/ year on fabric softener while on social security. Over the year she has spent thousands and thousands of $$$. 🤦‍♀️




  • Not all 7,000 construction workers would be working on the site concurrently. Different trades come and go depending on the phase of the project. So at first you’ll have the civil engineering earth movers come in, who clears the site and excavates the foundations. Then you’ll have the concrete crews come in who pour the foundations and do all of the concrete work. Obviously on a nuclear power plant there is a lot of foundation work, as well as a lot of above ground concrete so probably a good chunk of the construction workers will fall into this category.

    Power plants also have a lot of structural steel work, electrical and special equipment that would likey fall under the piping category but each of these uses a separate set of skilled labor that does not overlap.

    If you were going to actually try to build 3,300 nuclear power plants, you would rotate crews from project to project which would increase efficiency rather than hiring 27 million separate workers.

    In any case, I don’t think converting the world’s total electrical power generation to 100% nuclear is by any stretch of the imagination a good idea. Personally I think maybe 15 to 25% nuclear power generation would be a more realistic mix, similar to the US electrical power generation. The rest of the power should be solar, wind, hydro, wave and geothermal as they are absolutely cheaper to build.